Eighteen Months for a Transformer: Critical Equipment Loss
Utilities and energy tabletop exercise scenario · Critical Equipment Failure
The transformer doesn't just break — it's a total loss, it's custom-built, and the replacement queue is over a year long. The grid holds today on a thinned margin. But now you have to run a critical node without its anchor, through peak season, for eighteen months, hoping nothing else on that node fails while you wait.
This scenario runs utility planning, operations, and supply-chain leaders through the slow-motion crisis of losing irreplaceable, bespoke equipment: the sourcing scramble across manufacturer queues, industry spare-sharing, and your own fleet; the formal risk-acceptance decision about operating a weakened node through peak demand; and the long wait with a regulator and board newly aware of a single-point vulnerability. Then the resilience program — spares, standardization, and the capital case for never being here again. Because the lights staying on today is not the same as being okay.
1 hr 30 minIntermediate
Utilities & Energy
What this scenario tests
- Whether your reliability picture at the weakened node is honest about contingency exposure
- How aggressively your sourcing works the queue, the spare-sharing programs, and your own fleet
- Who formally owns the risk of running a critical node through peak season without its anchor
- Whether your resilience program fixes the single-point vulnerability or just survives it
Who it's for
Operations Team · Executive / C-Suite · Finance Team